The Story of Project
Construction Process
Infrastructure Strategy & Projections
May 2026
1. Water Supply
- Water main installed throughout the residential complex with connections provided to each lot.
- Connection to Abbanoa (main water utility point) completed.
2. Sewage System
- Sewage pipeline installed throughout the residential complex with connections provided to each lot.
- Connection to the public sewage network completed.
3. Stormwater Drainage
- Stormwater drainage system installed throughout the residential complex.
4. Fire Safety
- Two fire hydrants installed on-site.
5. Electrical & Low Current
- Conduits for electricity and low-current cables have been laid.
- Transformer substation installed to ensure power supply.
6. Retaining Walls
- Construction of main retaining walls across the site completed.
7. Roads and Sidewalks
- Internal roads laid and paved with asphalt.
- Pedestrian walkways constructed and finished throughout the complex.
- Curbs installed.
- Gullies and catch basins (water inlets) installed.
8. Lighting
- Lighting poles installed for roads and parking areas.
- Connection for common area lighting established.
- Conduit installed for the illumination of the stone wall (muretto).
9. Common Areas and Site Prep
- Clearing of the entire territory from overgrown vegetation.
- Restoration and reconstruction of the perimeter stone wall.
- Plots prepared for the commencement of house construction.